Advanced control with new Potterton boiler

Potterton Commercial, boiler

Potterton Commercial’s Paramount Three wall-hung condensing boiler has a control system for three heating zones and a DHW cylinder to ensure compliance with Part L2 of the Building Regulations. The functionality of the control unit is integrated into the PCB of the boiler so that when installed in cascade as part of a modular heating system, a separate control box is no longer required.

Installation is quicker, easier and less costly, and more zones can be added if needed. The lead boiler can control the others in the system and change around the lag and lead boilers to achieve uniform use and continuous running during maintenance.

There are six outputs from 30 to 115 kW. Efficiency is up to 109% net with NOx emissions of less than 20 mg/kWh — exceeding Class 5.

The aluminium/silicon alloy heat exchanger comes with a 10-year guarantee.

The control system offers text display of operational status with built-in weather compensation, Summer/Winter changeover and time-control.

For more information on this story, click here: January 2012, 103
Related links:
Related articles:



modbs tv logo

Carrier calls for prioritisation of ventilation in NHS infrastructure plans

As the healthcare sector begins
to plan how new government infrastructure funding will be spent, Carrier is urging NHS estates teams to prioritise ventilation upgrades as part of long-term building improvement strategies.

Specifiers urged to act ahead of looming legislation

Specifiers are being encouraged to switch to efficient secondary hot water circulators ahead of anticipated legislation that will ban inefficient versions of these domestic and commercial plumbing products.