Advanced control with new Potterton boiler

Potterton Commercial, boiler

Potterton Commercial’s Paramount Three wall-hung condensing boiler has a control system for three heating zones and a DHW cylinder to ensure compliance with Part L2 of the Building Regulations. The functionality of the control unit is integrated into the PCB of the boiler so that when installed in cascade as part of a modular heating system, a separate control box is no longer required.

Installation is quicker, easier and less costly, and more zones can be added if needed. The lead boiler can control the others in the system and change around the lag and lead boilers to achieve uniform use and continuous running during maintenance.

There are six outputs from 30 to 115 kW. Efficiency is up to 109% net with NOx emissions of less than 20 mg/kWh — exceeding Class 5.

The aluminium/silicon alloy heat exchanger comes with a 10-year guarantee.

The control system offers text display of operational status with built-in weather compensation, Summer/Winter changeover and time-control.

For more information on this story, click here: January 2012, 103
Related links:
Related articles:



modbs tv logo

Baxi survey reveals care home leaders need support to achieve heat decarbonisation goals

Baxi recently surveyed over 400 senior and middle management care home managers in both the private and public sector this summer in an effort to understand the enablers required to help decarbonise the sector.

CIBSE launches Society of Vertical Transportation to elevate standards worldwide

CIBSE has officially launched the Society of Vertical Transportation (SoVT), an international professional community for individuals and organisations working across the design, engineering, installation and innovation of lifts, escalators and emerging vertical mobility systems.