Refitted plant room saves £45 000 a year

Spirax, plate heat exchanger, boiler
The before and after of the refitting of a hospital plant room that is achieving energy and maintenance savings of £45 000 a year.

St George’s Hospital in Tooting is saving £45 000 a year by upgrading its heating and hot-water systems from calorifiers to plate heat exchangers. Five EasiHeat systems from Spirax now serve the Lanesborough wing of this 1000-bed hospital. Three provide heating and two deliver domestic hot water in a duty/standby arrangement. Heating was previously provided by three shell-and-tube calorifiers and hot water by four more calorifiers. The £45 000 savings are a combination of improved energy efficiency and reduced maintenance.

Heating and hot water are now delivered on demand, eliminating the energy losses from hot water stored in calorifiers.

The EasiHeat plate heat exchangers also include a second-pass condensate cooler to help condense the steam and encourage more efficient heat transfer.

The need for calorifiers, as pressure vessels, to be stripped down for insurance inspections every two years has reduced maintenance costs. EasiHeats are exempt from insurance inspections.

An EasiHeat system comprises plate heat exchanger, controls and other ancillaries in a packaged system that is factory tested. The touch-screen panel makes it easy for maintenance staff to make adjustments and check the status of the units.

For more information on this story, click here: January 2012, 101
Related links:
Related articles:



modbs tv logo

Industry urged to see Clean Heat Market Mechanism target as opportunity

The UK government has confirmed that the next phase of the Clean Heat Market Mechanism (CHMM) will set an 8% target for the proportion of heat pumps to fossil fuel boiler sales.

2025 CSA Awards winners announced

The Commissioning Specialists Association (CSA) returned to London on the evening of 2nd October for the staging of its 10th Annual Awards Ceremony.