Refitted plant room saves £45 000 a year

Spirax, plate heat exchanger, boiler
The before and after of the refitting of a hospital plant room that is achieving energy and maintenance savings of £45 000 a year.

St George’s Hospital in Tooting is saving £45 000 a year by upgrading its heating and hot-water systems from calorifiers to plate heat exchangers. Five EasiHeat systems from Spirax now serve the Lanesborough wing of this 1000-bed hospital. Three provide heating and two deliver domestic hot water in a duty/standby arrangement. Heating was previously provided by three shell-and-tube calorifiers and hot water by four more calorifiers. The £45 000 savings are a combination of improved energy efficiency and reduced maintenance.

Heating and hot water are now delivered on demand, eliminating the energy losses from hot water stored in calorifiers.

The EasiHeat plate heat exchangers also include a second-pass condensate cooler to help condense the steam and encourage more efficient heat transfer.

The need for calorifiers, as pressure vessels, to be stripped down for insurance inspections every two years has reduced maintenance costs. EasiHeats are exempt from insurance inspections.

An EasiHeat system comprises plate heat exchanger, controls and other ancillaries in a packaged system that is factory tested. The touch-screen panel makes it easy for maintenance staff to make adjustments and check the status of the units.

For more information on this story, click here: January 2012, 101
Related links:
Related articles:



modbs tv logo

Commercial landlords face MEES compliance crunch

Two-thirds of UK commercial real estate (CRE) owners admit they are “not fully compliant” with energy efficiency regulations, according to new research from smart buildings specialist LMG. 

Recognising outstanding achievements at CIBSE Building Performance Awards 2025

The Park Plaza Westminster Bridge in London came alive on 27th February 2025 for the prestigious CIBSE Building Performance Awards.