Wolseley sets shining example with huge solarPV installation

Wolseley, solarPV, renewable energy

Set to produce 16 GWh a year of electricity is this solar PV installation on the roof of Wolseley UK’s national distribution centre in Leamington Spa. The installation of 8020 panels covers an area of over 13 000 m2 and has 24 inverters.

Installation was carried out over six months and could generate an income of £6.5 million over 20 years from the Feed in Tariff for commercial buildings. The payback is 6.8 years, after which electricity wil effectively be free. At full output, the system will completely power the centre and have a 10% surplus.

The installation will help to improve the environmental performance of the site, which already has a ‘Very good’ BREEAM rating.

Exhaust air from the inverters is channelled into the building’s heating system, adding about 80 kW of additional heat. For safety, automated DC breakers connected to the fire-control system will disconnect the panels iif the fire alarm is activated.

Related links:
Related articles:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.