Liverpool energy centre in topping out ceremony

CHP, Vital Energi

The topping out of the CHP energy centre at the old Royal Infirmary mortuary building in Liverpool was marked by placing this 11.2 x 4 m penthouse louvre section on the roof of the Grade 2 listed building. The energy centre includes two CHP engines, and the penthouse louvre section meets their need for ventilation.

Vital Energi installed a pair of 2 MW(e) engines, which have a combined weight of 46 t, on the first floor.

Related links:
Related articles:



modbs tv logo

Heat network confidence outpaces progress in social housing

Baxi surveyed 100 housing associations and 102 local authorities and councils responsible for managing or operating heat networks this summer, alongside in-depth interviews with five housing associations, a heat network consultant and heat network contractor.

Signify showcases F1 lighting partnership at Brackley campus

MBS Features Editor Russell Drury was among a group of journalists from across Europe invited to visit the Mercedes-AMG PETRONAS Formula One Team’s headquarters in Brackley, where Signify showcased its partnership with the team and the shared focus on innovation and sustainability.