Bottisham Village College reboilers with equipment from Mikrofill

maintenance, refurbishment, Mikrofill, boiler, space heating

New boiler plant for Bottisham Village College in Cambridgeshire, which was opened in 1937, has been suppled by Mikrofill. The college’s initial vision was to provide good-quality education for local children by day and for adults by night. In the early days, the college also served as the local picture house, concert hall and theatre.

The new boilers include two condensing boiler packages to serve part of the main school and the sports hall/swimming pool area.

Mikrofill also supplied numerous Ethos 70 and 130 kW wall-mounted boilers, complete with cascade control systems, low-loss headers and air/dirt separation and pressurisation packages.

The equipment was installed by design-and-build contractor Blueflame Heating of Huntingdon.

For more information on this story, click here: March 2015, 86
Related links:
Related articles:



modbs tv logo

BSRIA reports sustained global cooling demand as market diverges

BSRIA has released its latest analysis of the global cooling sector. The BSRIA Worldwide Air Conditioning and Heat Pump reports reveal a complex and diverging global cooling market.

CABE awards two new accolades alongside 2026 Honorary Fellowship

At the CABE presidential inauguration on 8th May, the Association was delighted to present two new awards for 2026 alongside its Honorary Fellowship for this year.