Tectite installation times compared with other joints

Testing of Pegler Yorkshire’s Tectite push-fit system for pipework has shown substantial reductions in installation time compared with threaded joints and press-fit. The tests involved creating a prefabricated module containing three separate services and using all three jointing techniques.

Pipework company MEP created the module using Tectite three times faster than using threaded joints.

Construction business Balfour Beatty pitted Tectite against press-fittings and reduced installation time by 17 minutes to one hour flat — a 25% time saving.

For more information on this story, click here: Dec 2015, 205
Related links:
Related articles:



modbs tv logo

Smart and sustainable

Schneider Electric has announced its smart energy management solutions feature in the London headquarters of design, engineering and consulting group Sidara.

Fields of green

Lochinvar has provided a complete heating and hot water system powered by four air source heat pumps for a new luxury 72-bedroom care home set in rolling Yorkshire countryside.