Andrews Chiller Hire responds to urgent need of London Hotel

Andrews Chiller Hire, air conditioning, chilled water

Andrews Chiller Hire was quick to respond to the urgent requirements of a large 5-star hotel in London when its air-conditioners were taken offline while waiting for new plant to be installed. The hotel has 400 bedrooms, including a number of studio and bedroom suites. Taking the existing chiller plant offline had a more significant effect on the hotel cooling than management had anticipated, so a solution was urgently needed.

In response to an urgent request, Andrews had a 750 kW chiller on site and installed within 48 h. The chiller had to be positioned in a restricted service road at the rear of the hotel (as pictured), which meant out-of-hours delivery to prevent disruptions. The chiller was left on a trailer in a parking bay next to the service road.

Access and installation was extremely difficult — but a way of life for the Andrews team. Hoses from the chiller were passed down a light well into the hotel basement, along a corridor and connected to the chiller circuit to restore cooling to the hotel.

For more information on this story, click here: May 2016, 122
Related links:
Related articles:



modbs tv logo

Commercial landlords face MEES compliance crunch

Two-thirds of UK commercial real estate (CRE) owners admit they are “not fully compliant” with energy efficiency regulations, according to new research from smart buildings specialist LMG. 

Recognising outstanding achievements at CIBSE Building Performance Awards 2025

The Park Plaza Westminster Bridge in London came alive on 27th February 2025 for the prestigious CIBSE Building Performance Awards.