Andrews Chiller Hire responds to urgent need of London Hotel

Andrews Chiller Hire, air conditioning, chilled water

Andrews Chiller Hire was quick to respond to the urgent requirements of a large 5-star hotel in London when its air-conditioners were taken offline while waiting for new plant to be installed. The hotel has 400 bedrooms, including a number of studio and bedroom suites. Taking the existing chiller plant offline had a more significant effect on the hotel cooling than management had anticipated, so a solution was urgently needed.

In response to an urgent request, Andrews had a 750 kW chiller on site and installed within 48 h. The chiller had to be positioned in a restricted service road at the rear of the hotel (as pictured), which meant out-of-hours delivery to prevent disruptions. The chiller was left on a trailer in a parking bay next to the service road.

Access and installation was extremely difficult — but a way of life for the Andrews team. Hoses from the chiller were passed down a light well into the hotel basement, along a corridor and connected to the chiller circuit to restore cooling to the hotel.

For more information on this story, click here: May 2016, 122
Related links:
Related articles:



modbs tv logo

Nuaire celebrates long service and a people-first culture built over decades

Nuaire has celebrated the exceptional loyalty and dedication of its employees at a long service awards event – a powerful reflection of a workplace culture that has been built and sustained over generations.

New advanced training facility opens to upskill HVAC industry

A new education facility has opened its doors and is set to advance skills and knowledge across the UK’s HVAC industry.