Merlin adds to its fleet of standby generators

Generators from Merlin’s rental fleet can be up and running within 30 minutes of delivery to site.
Merlin Power Management is expanding its rental fleet of electrical generators by around 20% following another successful year by the company’s rental department. The extra generators have outputs of 30, 60 and 100 kVA and are available with connecting cables, control panels, distribution boards and wheel clamps. The plug-and-play concept for renting a generator enables it to be up and running in less than 30 minutes. Cables, plugs and sockets are colour coded for foolproof installation. The plug-and-play systems enables installation between Merlin’s generators, an AMF panel and the customer’s load to be carried out using only plug-and-socket connections.
For more information on this story, click here:Aug, 08 192
Related links:
Related articles:



modbs tv logo

Lighting the way

Halesowen College has set a sustainability example for higher education institutions by installing smart lighting as part of its latest environmental initiative, making up to 85% energy savings compared to the previous system.

BESA updates HIU Test Standard

The Building Engineering Services Association (BESA) has announced an important update to its UK Heat Interface Unit (HIU) Test Standard, further strengthening performance benchmarks and supporting the sector’s readiness for incoming heat network regulation.