Gas-fired humidifiers provide efficient solution for new hospital

vapac
Energy-efficient humidification for this new treatment centre in an Ipswich is achieved using Vapac gas-fired humidifiers.
Energy-saving gas-fired humidifiers made by Vapac Humidity Control have been installed at the Garrett Andersen Centre, a new treatment centre for the Ipswich Hospital NHS Trust. Seven GF40 humi­difiers installed by Dodd Group serve the operating theatre and recovery areas. Vapac units were selected because the hospital does not have steam-generating plant and because a large number of standard electrode boilers would have been required, with high electricity costs and hard water being issues. NOx emissions from these humidifiers are 36 ppm at maximum output, with a net efficiency of 95.6% at maximum capacity.
For more information on this story, click here: October08, 124
Related links:
Related articles:



modbs tv logo

BSRIA reports sustained global cooling demand as market diverges

BSRIA has released its latest analysis of the global cooling sector. The BSRIA Worldwide Air Conditioning and Heat Pump reports reveal a complex and diverging global cooling market.

CABE awards two new accolades alongside 2026 Honorary Fellowship

At the CABE presidential inauguration on 8th May, the Association was delighted to present two new awards for 2026 alongside its Honorary Fellowship for this year.