Grundfos checks in at Park Plaza hotel

Grundfos pumps
One of the largest hotel developments in Europe, the Park Plaza in London, is fully serviced by Grundfos pumps.

One of the largest hotel developments in Europe, the 1021-room Park Plaza on the site of the former County Hall Annexe in London has its pumping requirements met by a complete turnkey solution from Grundfos. The £350 million project includes 2700 m2 of flexible meeting space on three floors, including the Westminster Ballroom that can accommodate 1400 people theatre style or 1000 for dinner.

The pump line-up includes a wide range of circulator and centrifugal pumps to support heating and hot-water services as well as cooling and air-conditioning needs. There are also single-stage standard pumps for liquid transfer, Hydro MPCE booster sets and SEV sewage pumps.

The fire-safety system also includes Grundfos pumps.

For more information on this story, click here:  Nov 2010, 140
Related links:
Related articles:



modbs tv logo

Built environment professionals remain positive on future of Net Zero

A recent survey by global climate tech firm IES has revealed that nearly three-quarters of UK built environment professionals believe achieving a Net Zero built environment by 2050 is within reach.

BESA research suggests clients are yet to engage with new building safety regime

Construction clients are failing to engage with the new building safety regime, according to research carried out by the Building Engineering Services Association (BESA).