Water authority uses chilled water energy efficiently

Ability Projects, air conditioning, FCU, fan coil unit
Ability Projects energy-efficient fan-coil units are used extensively throughout the new operations centre of Severn Trent Water.

Energy-efficient air conditioning for the new £60 million operations centre of Severn Trent Water is provided with the help of fan-coil units from Ability Projects. These ECDC Evolution fan-coil units use 75% less electricity than AC equivalents with a similar cooling capacity and provide infinitely variable speed control.

The 15 800 building is served by 2-pipe units with cooling capacities ranging from 1.68 to 6.3 kW and NR35 at 35 Pa. There is a mixture of horizontal ceiling-recessed units and vertical units. The vertical units are fitted with special rectangular spigots, and some have special split access panels for ease of maintenance.

Other technologies in the building include thermal adaptive cooling, biomass boilers, Solar PV panels, underfloor displacement ventilation and rainwater harvesting.

This 38 m-high building is designed to BREEAM ‘Excellent’ standards and is thought to have one of the lowest carbon footprints in the UK.

M&E contractor was Balfour Beatty Engineering Services.

For more information on this story, click here: December 10, 121
Related links:
Related articles:



modbs tv logo

Rinnai ‘learn and earn’ bursaries CPD -exclusively at Elemental show London Excel November 25/26th 2026 - STAND No E224

Rinnai is continuing to offer its highly prized discretionary bursaries of up to £200 for eligible visitors to the company’s stand at this year’s Elemental Show in the  London Excel. 

Yorkshire and Humber leaders set out plans to tackle skills shortages

Leaders from across Yorkshire and the Humber came together on Friday 11th September to launch ambitious plans aimed at tackling the region’s growing construction skills shortages.