Modern lighting reduces connected load by 40%

Trilux, lighting, LEDs

The connected lighting load for the Watershed arts centre in Bristol has been reduced by 40% by an all-LED system developed and specified by Arup’s lighting team for the public, conference and office areas, with Trilux lighting for the back-office zone.

Mike Matthews, Trilux project engineer, explains, ‘The main objective for the office area was to have a lighting scheme that would help to rejuvenate and refresh the admin areas for staff. Our Lateralo range provided the optimum solution. The innovative optic provides outstanding visual comfort, ideal for working offices. Visually it provides a striking office statement but when switched-off the optic is transparent, enabling the extremely flat luminaire to discreetly float in the space.’

The building’s original lighting installation included layers of luminaires installed during previous maintenance or refurbishment programmes. In many cases, luminaires were fitted with tungsten-halogen lamps. The new all-LED installation prioritised flexibility and took full consideration of both the building’s original architectural features and current occupancy patterns.

For more information on this story, click here: May 2017, 129
Related links:
Related articles:



modbs tv logo

Rinnai ‘learn and earn’ bursaries CPD -exclusively at Elemental show London Excel November 25/26th 2026 - STAND No E224

Rinnai is continuing to offer its highly prized discretionary bursaries of up to £200 for eligible visitors to the company’s stand at this year’s Elemental Show in the  London Excel. 

Yorkshire and Humber leaders set out plans to tackle skills shortages

Leaders from across Yorkshire and the Humber came together on Friday 11th September to launch ambitious plans aimed at tackling the region’s growing construction skills shortages.