Modern lighting reduces connected load by 40%

Trilux, lighting, LEDs

The connected lighting load for the Watershed arts centre in Bristol has been reduced by 40% by an all-LED system developed and specified by Arup’s lighting team for the public, conference and office areas, with Trilux lighting for the back-office zone.

Mike Matthews, Trilux project engineer, explains, ‘The main objective for the office area was to have a lighting scheme that would help to rejuvenate and refresh the admin areas for staff. Our Lateralo range provided the optimum solution. The innovative optic provides outstanding visual comfort, ideal for working offices. Visually it provides a striking office statement but when switched-off the optic is transparent, enabling the extremely flat luminaire to discreetly float in the space.’

The building’s original lighting installation included layers of luminaires installed during previous maintenance or refurbishment programmes. In many cases, luminaires were fitted with tungsten-halogen lamps. The new all-LED installation prioritised flexibility and took full consideration of both the building’s original architectural features and current occupancy patterns.

For more information on this story, click here: May 2017, 129
Related links:
Related articles:



modbs tv logo

Engineering services alliance welcomes retentions reporting legislation

Engineering services alliance Actuate UK has warmly welcomed the new secondary legislation which will require reporting of cash retentions held by the large construction companies under the Reporting Regulations. 

NG Bailey Net Zero target validated by leading environmental body

NG Bailey has become one of the first construction and engineering companies in the UK to have its long-term target to achieve Net Zero emissions
by 2045 approved by the Science Based Targets Initiative (SBTI).