Mikrofill delivers heating package for school in Wimbledon

Mikrofill, space heating, boiler, DHW

Time-served cast-iron boilers in a school in south west London have been replaced with Mikrofill’s Ethos condensing boiler package to provide an effective solution. Access to the boiler house of North House of Linden Lodge School was awkward, and there was limited space.

Mikrofill’s products had the further advantage of being transported from the UK production line straight to site for mechanical contractor Technical Services to install. The installation provides primary heat to radiators and a large open-vented hot-water calorifier.

Other equipment supplied for the project included a pressurisation package, unvented DHW loading system and cascade control incorporating remote operation.

For more information on this story, click here: October 2013, 83
Related links:
Related articles:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.