Mikrofill supports CHP and solar installation

Mikrofill, boiler, space heating

As part of the CHP-based system and solar-thermal installation for updating heating and hot water at Rydale Swimming Pool in Pickering, Mikrofill has supplied boilers and energy-efficient hot-water cylinders.

Equipment installed by H. Pickup Mechanical & Electrical services of Scarborough includes two floor-standing boilers with a combined output of 700 kW and turndown to 35 kW. These boilers also supply two Extreme hot-water loading systems to produce up to 2370 l/h at 60°C while keeping the boilers in condensing mode.

Consulting engineer for the project was Preston Lee Chambers of Cheshire.

For more information on this story, click here: January 2014, 87
Related links:
Related articles:



modbs tv logo

WIN a Bang & Olufsen speaker system – in the MBS subscriber prize draw 2024

Subscribe, or renew your free subscription, to MBS between 1st June and September 30 2024 and you could win a great prize.

Going Underground

ABM has announced a significant contract win with Transport for London (TfL) to provide mechanical and electrical (M&E) services across the London Underground network.