J S Wright to service major residential development in London

JS Wright

J S Wright has secured a contract worth about £5 million to service 546 new homes as part of the second phase of Indescon Court in the Millharbour area of London. The family-friendly development by Galliard Homes is due to open in June 2015 and will also include a 120-bed 3-star hotel, retail space and a business centre — along with a green area and children’s playing area.

The homes will be housed within a main tower of five blocks up to 31 storeys high and a neighbouring 10-storey rotunda building.

The design by Mendick Waring Consultants includes a gas-fired CHP boiler system in a central energy centre. Up to 20% of the development’s energy will come from on-site renewable energy. An LPHW system will distribute heating and hot- and cold-water services to the apartments, hotel and ground-floor commercial units.

J S Wright will also be fitting ventilation, sprinklers, chilled water, above-ground drainage and sanitation throughout the development — along with building controls.

Related links:
Related articles:



modbs tv logo

Improved dry pocket for SpiroTrap and SpiroCombi

Spirotech has improved the dry pocket of the magnetic dirt separator in its steel SpiroTrap and SpiroCombi units, making them even easier to maintain.

FREE Heat Pump Training from BESA

The Building Engineering Services Association (BESA) is launching the industry’s only online training course for heat pump installation to help fill a skills gap highlighted by the government’s flagship Green Homes Grant voucher scheme.

Calendar