School refurbishment uses Mikrofill boilers

Mikrofill, boiler, space heating

Heating for new and refurbished buildings at Langley Park School for Boys in Beckenham is provided by boilers from Mikrofill. The work included a state-of-the-art performance space, a new Sport England sports hall adjacent to the Phythian Building, which was refurbished to match the new construction.

Design-and-build contractor LJJ of High Wycombe selected floor-standing condensing boilers and HWS Extreme loading systems for DHW across the site.

Two twin-burner Ethos 350 kW boilers were installed in the new school to provide heating to numerous variable-temperature circuits. They also provide heat to a bank of Rapide Extreme HWS loading systems to produce over 2570 l/h of DHW at 60°C.

Two more of the same boilers were installed to serve the Phythian and sports hall buildings, along with a Mikrovent 750 low-loss header integral air and dirt separation.

A turndown ratio of 20:1 ensures excellent load matching and operating efficiency.

For more information on this story, click here: November 2014, 115
Related links:
Related articles:



modbs tv logo

Johnson Controls’ expansion of Izmir plant shortens delivery times, triples production capacity for commercial heat pumps

Johnson Controls has announced the expansion of production capacity at its plant in Izmir, Turkey. 

Elta invests over £650k in new machinery as it eyes growth in production

Continuing its expansion and growth strategy, Elta has invested in two new machines to streamline and improve its manufacturing capabilities. This comes on the back of the air movement specialist’s 50th anniversary.