LJJ wins CL2 scheme at The Pirbright Institute

LJJ, contractor

LJJ has been awarded the M&E design and installation contract for a new containment level 2 (CL2) facility at The Pirbright Institute, a national centre for preventing and containing viral diseases of farm animals and those that can spread from animals to humans. The facility is designed have a BREEAM ‘Excellent’ rating.

The project builds on LJJ’s experience of laboratory schemes and will include the design and installation of class A, B and C ductwork appropriate to the low-risk CL2 status.

The roof-top plant room will include extraction plant with heat recovery, chilled and gas boilers.

DALI lighting systems in the laboratory and office areas will include manual on and absence-detection off functionality.

Contracts manager Jason Burns, comments, ‘While the scheme involves a relatively low containment level classification, this remains a complex programme with some very specific requirements, both in terms of the CL2 facility itself and the infrastructure works to aid future development.’

Related links:
Related articles:



modbs tv logo

Baxi survey reveals care home leaders need support to achieve heat decarbonisation goals

Baxi recently surveyed over 400 senior and middle management care home managers in both the private and public sector this summer in an effort to understand the enablers required to help decarbonise the sector.

CIBSE launches Society of Vertical Transportation to elevate standards worldwide

CIBSE has officially launched the Society of Vertical Transportation (SoVT), an international professional community for individuals and organisations working across the design, engineering, installation and innovation of lifts, escalators and emerging vertical mobility systems.