Zucchini powers up O2 Arena

Zucchini
The redesign of the electrical power systems for the largest entertainment venue in Europe, the O2 Arena in London, makes extensive use of equipment from Zucchini. The company supplied 15 of its latest-generation EdM cast-resin transformers from its 1250 to 3150 kVA power ranges. Reduced noise, zero maintenance, energy efficiency, no pollution and fire resistance were all factors influencing their selection. Zucchini worked closely with Sapphire Controls of Norwich, which was responsible for installing the transformers Working with DES Electrical of Blackpool and T. Clarke Plc of London, Zucchini also supplied and installed its 2500 A SC high-power busbar systems with ‘weatherproof specifications’. The distribute power through the indigO2 live-music venue, which is inside the O2 Arena and has a capacity of 2350 people.
For more information on this story, click here: Nov08, 133
Related links:
Related articles:



modbs tv logo

Construction Skills Certification Scheme (CSCS) Smart Check launched to boost competence and fight fraud

Construction Skills Certification Scheme (CSCS) has developed a ‘Smart Check’ app to help construction site operators verify the identities and qualifications of more than two million skills card holders. 

MBS attends the BESA launch of ‘safe havens’ blueprint for air quality

The Building Engineering Services Association (BESA) has completed its trilogy of free guides designed to help building owners and managers turn their buildings into ‘safe havens’ that protect occupants from health risks linked to airborne contaminants and viruses.