Radiant heating is put through its capabilities at RAF Northolt

Nor-Ray-Vac
Flexible and zoned heating for five new hangars at RAF Northolt is provided by Nor-Ray-Vac continuous radiant-tube heating.

Space heating for the hangars in the new RAF Northolt site is provided by Nor-Ray-Vac continuous radiant-tube heating.

The installation is part of the Ministry of Defence Estate’s Project MoDEL, a £180 million investment and restructuring scheme to create a world-class 21st century ‘anchor site’ in London.

The redesigned RAF Northolt includes five new hangars.

Four of them measure 38 by 36 m and are fitted with six 38LR Nor-Ray-Vac burners in two temperature zones.

The fifth hangar measures 42 by 40 m and is known as the workshop hangar. It is heated by six 46LR burners in two temperature zones.

These heating systems provide flexible heating so the hangars can house small/medium-sized fixed-wing aircraft and helicopters.

Ducted air is supplied to the burners and radiant branch end vents to comply with the Crown Fire Standard for operational aircraft hangars.

For more information on this story, click here: june 09, 146
Related links:
Related articles:



modbs tv logo

Built environment professionals remain positive on future of Net Zero

A recent survey by global climate tech firm IES has revealed that nearly three-quarters of UK built environment professionals believe achieving a Net Zero built environment by 2050 is within reach.

BESA research suggests clients are yet to engage with new building safety regime

Construction clients are failing to engage with the new building safety regime, according to research carried out by the Building Engineering Services Association (BESA).