Skid-mounted boilers simplify plant replacement in two primary schools near Leeds

Remeha Boilers
Remeha skid-mounted boilers have replaced existing boilers at Shadwell Primary School near Leeds.

As part of a Government-funded replacement programme for capital works in schools, Remeha skid-mounted boilers are proving a popular choice in the Leeds area. Quinta boilers have bee installed by Sayes & Co. of Leeds in two primary schools, one in Shadwell and one in Otley.

Shadwell Primary School has had its entire heating system renewed. It is served by two Quinta 85 skid-mounted boilers with bespoke control panel.

At Otley All Saints School, the new plant comprised two skid-mounted boilers — one a Quinta 85 and the other a Quinta 65.

Remeha’s skid-mounted concept simplifies installation and reduces downtime. Built on a rigid box frame, the units are only 650 mm wide, so they can be rolled into position through a standard doorway.

Pipework is pre-assembled for ease of transport and installation.

Quinta boilers are also quiet and have low NOx emissions.

For more information on this story, click here: Aug 09, 139
Related links:
Related articles:



modbs tv logo

Engineering Services alliance welcomes critical Net Zero report

Engineering services alliance Actuate UK has warmly welcomed the landmark report ‘At a Crossroads: Pathways to a Net Zero Future’ published by the Mission Zero Coalition. The report throws a spotlight on clean energy and power generation. The engineering services industry, as part of the supply chain, is key to delivering this aspect of the UK’s Net Zero ambitions.

Elta Group acquires Air Movement Supplies in Ireland

Elta Group has announced the acquisition of Air Movement Supplies (AMS) in Ireland.