Waterwise Technology wins Shard contract

Waterwise Technology has secured the water-treatment contract for the Shard at London Bridge, which, at 310 m high, will be the tallest building in the UK and western Europe. The building is designed as a ‘vertical city’ that includes 54 500 m2 of world-class office space, a collection of residential apartments that will be the highest in the UK, 5-star Shangri-La Hotel with spa and pool and restaurants and viewing galleries with 360° views of London.

Water-treatment equipment to be supplied by Waterwise includes water-softening equipment, water-treatment equipment and sidestream filtration for the cooling towers. The company will also supply three large water purifiers to provide distilled-quality water for cleaning the building facade, preventing any water marks that would otherwise occur.

For more information on this story, click here: October 10, 132
Related links:
Related articles:



modbs tv logo

Heat network confidence outpaces progress in social housing

Baxi surveyed 100 housing associations and 102 local authorities and councils responsible for managing or operating heat networks this summer, alongside in-depth interviews with five housing associations, a heat network consultant and heat network contractor.

Signify showcases F1 lighting partnership at Brackley campus

MBS Features Editor Russell Drury was among a group of journalists from across Europe invited to visit the Mercedes-AMG PETRONAS Formula One Team’s headquarters in Brackley, where Signify showcased its partnership with the team and the shared focus on innovation and sustainability.