Waterwise Technology wins Shard contract

Waterwise Technology has secured the water-treatment contract for the Shard at London Bridge, which, at 310 m high, will be the tallest building in the UK and western Europe. The building is designed as a ‘vertical city’ that includes 54 500 m2 of world-class office space, a collection of residential apartments that will be the highest in the UK, 5-star Shangri-La Hotel with spa and pool and restaurants and viewing galleries with 360° views of London.

Water-treatment equipment to be supplied by Waterwise includes water-softening equipment, water-treatment equipment and sidestream filtration for the cooling towers. The company will also supply three large water purifiers to provide distilled-quality water for cleaning the building facade, preventing any water marks that would otherwise occur.

For more information on this story, click here: October 10, 132
Related links:
Related articles:



modbs tv logo

Lighting the way

Halesowen College has set a sustainability example for higher education institutions by installing smart lighting as part of its latest environmental initiative, making up to 85% energy savings compared to the previous system.

BESA updates HIU Test Standard

The Building Engineering Services Association (BESA) has announced an important update to its UK Heat Interface Unit (HIU) Test Standard, further strengthening performance benchmarks and supporting the sector’s readiness for incoming heat network regulation.