Waterwise Technology wins Shard contract

Waterwise Technology has secured the water-treatment contract for the Shard at London Bridge, which, at 310 m high, will be the tallest building in the UK and western Europe. The building is designed as a ‘vertical city’ that includes 54 500 m2 of world-class office space, a collection of residential apartments that will be the highest in the UK, 5-star Shangri-La Hotel with spa and pool and restaurants and viewing galleries with 360° views of London.

Water-treatment equipment to be supplied by Waterwise includes water-softening equipment, water-treatment equipment and sidestream filtration for the cooling towers. The company will also supply three large water purifiers to provide distilled-quality water for cleaning the building facade, preventing any water marks that would otherwise occur.

For more information on this story, click here: October 10, 132
Related links:
Related articles:



modbs tv logo

BSRIA reports sustained global cooling demand as market diverges

BSRIA has released its latest analysis of the global cooling sector. The BSRIA Worldwide Air Conditioning and Heat Pump reports reveal a complex and diverging global cooling market.

CABE awards two new accolades alongside 2026 Honorary Fellowship

At the CABE presidential inauguration on 8th May, the Association was delighted to present two new awards for 2026 alongside its Honorary Fellowship for this year.