Waterwise Technology wins Shard contract

Waterwise Technology has secured the water-treatment contract for the Shard at London Bridge, which, at 310 m high, will be the tallest building in the UK and western Europe. The building is designed as a ‘vertical city’ that includes 54 500 m2 of world-class office space, a collection of residential apartments that will be the highest in the UK, 5-star Shangri-La Hotel with spa and pool and restaurants and viewing galleries with 360° views of London.

Water-treatment equipment to be supplied by Waterwise includes water-softening equipment, water-treatment equipment and sidestream filtration for the cooling towers. The company will also supply three large water purifiers to provide distilled-quality water for cleaning the building facade, preventing any water marks that would otherwise occur.

For more information on this story, click here: October 10, 132
Related links:
Related articles:



modbs tv logo

Fujitsu General Air Conditioning becomes GENERAL HVAC Solutions UK

Fujitsu General Air Conditioning (UK) has become GENERAL HVAC Solutions UK from 1st January 2026, strengthening its long-term position within the global Paloma Rheem Holdings (PRH) group.

Market performance indicates encouraging signs for future of BEMS sector

Highlighting an increased desire from property developers, architects and designers to decarbonise the UK’s building stock through the specification and implementation of building controls and automation, the building energy management systems (BEMS) market showed steady progress in Q3 – rising 2.6% compared to the previous quarter.