Waterwise Technology wins Shard contract

Waterwise Technology has secured the water-treatment contract for the Shard at London Bridge, which, at 310 m high, will be the tallest building in the UK and western Europe. The building is designed as a ‘vertical city’ that includes 54 500 m2 of world-class office space, a collection of residential apartments that will be the highest in the UK, 5-star Shangri-La Hotel with spa and pool and restaurants and viewing galleries with 360° views of London.

Water-treatment equipment to be supplied by Waterwise includes water-softening equipment, water-treatment equipment and sidestream filtration for the cooling towers. The company will also supply three large water purifiers to provide distilled-quality water for cleaning the building facade, preventing any water marks that would otherwise occur.

For more information on this story, click here: October 10, 132
Related links:
Related articles:



modbs tv logo

Can I use my Air Conditioning system?

If your system hasn't been used in months it's an important question. 

New air-cooling system from Weiss Technik has unique four-stage safety concept and innovative thermal disinfection

The Coronavirus outbreak has increased awareness of hygienic room climate issues, ventilation and air-conditioning systems in public buildings. If planned poorly or not serviced properly, air conditioning units can quickly turn into transmitters of disease-causing germs.

Calendar
  • Calendar Icon
    11 November, 2020, 10:00 - 12 November, 2020, 16:00
    elemental
  • Calendar Icon
    20 November, 2020, 19:00 - 23:59
    CSA Awards