Potterton Commercial helps refurbish one of UK’s largest schools

Potterton Commercial, condensing boiler
Refurbishment work at Statonbury Campus in Milton Keynes includes seven Eurocondense two condensing boilers from Potterton Commercial.

Refurbishment work at one of the UK’s largest schools, Statonbury Campus in Milton Keynes, has seen the installation of seven Eurocondense two con­densing boilers from Potterton Commercial to provide space heating. Built in the 1970s, the school has 2600 pupils aged 11 to 18. The work was carried out over the Summer break in successive years. The first phase involved four blocks, including reception and the theatre. The second phase saw the upgrading of two academic blocks.

The boilers were selected by Architecture MK. Barry Hickmott, engineer of Architecture MK, said, ‘We standardised on Potterton Commercial boilers as we found them to be completely reliable, manoeuvrable and, with compact dimensions, easy to locate in plantrooms with difficult access.’

In the first phase, the three linked buildings are served by two 200 kW boilers supply the LPHW radiator system.

The second phase incorporates four 250 kW boilers with plate heat exchangers to protect the existing pipework and radiators from the higher operating pressures of the new boilers.

All the boilers were installed by T. Clarke East (formerly Aylward EMS).

For more information on this story, click here: May 2011, 133
Related links:
Related articles:



modbs tv logo

Lighting the way

Halesowen College has set a sustainability example for higher education institutions by installing smart lighting as part of its latest environmental initiative, making up to 85% energy savings compared to the previous system.

BESA updates HIU Test Standard

The Building Engineering Services Association (BESA) has announced an important update to its UK Heat Interface Unit (HIU) Test Standard, further strengthening performance benchmarks and supporting the sector’s readiness for incoming heat network regulation.