
Following a £500,000.00 investment Four Pure Brewing opened a new taproom based in London which was set to ‘blow people away’. The new facility includes a bespoke horseshoe bar with 43 taps, a reception room, brewery shop, meetings areas and a live music area.

Strand Palace upgrades with Mitsubishi Electric HVRF system
London’s Strand Palace Hotel has upgraded its cooling with an innovative hybrid VRF (HVRF) system from Mitsubishi Electric.

East London redevelopment uses Viega press fit
In partnership with M&E specialist Promech Services, Viega has supplied its Megapress press connection system for thick-walled steel tube to the redevelopment of the former Britannia Music offices in Ilford, East London.

GDL features at luxurious Crow Wood Hotel
The recently opened Crow Wood Hotel & Spa near Burnley is a luxury venue with 76 bedrooms and suites, set within 40 acres of secluded countryside offering wedding, spa and conference facilities.

Rinnai on the job for H Pickup & Sons
Scarborough-based H Pickup Mechanical & Electrical Services has applied a Rinnai continuous flow hot water solution at a large-scale seafood processing plant in the North East of England.

Dunham-Bush has supplied its Hydrocourse trench heating to the Devonshire Quarter for the £54 million transformation of the old Devonshire Park into a cultural, conferencing and sporting facility.

Coolair on track at Platform 21
Coolair Equipment has been awarded a £900,000 contract by Imtech Engineering Services Central on behalf of Wates Construction to help provide the best possible working conditions at a Birmingham property named Platform 21.

Semiconductor specialist turns to Prolojik for PoE smart building tech
Cambridge-based Arm Holdings, one of the world’s leading semiconductor design specialists, has used technologies from Prolojik in its new headquarters building.

Princes Dock focuses on heat metering with Micronics
Energy Metering Management has installed 24 Micronics U1000 heat meters at Princes Dock in Liverpool.

Elco boilers specified for London’s new landmark building
100 Bishopsgate is a striking new 40-storey office tower in the heart of London’s financial centre. Six Trigon XXL Evo boilers from Elco Heating Solutions have been installed in this at 900,000 sq feet building.

Waterloo brings breath of fresh air to Studley Castle
Waterloo Air Products’ grilles, air valves and diffusers have been used extensively throughout the renovated Studley Castle, successfully creating the perfect environment at Warner Leisure’s new landmark hotel.

Dunham-Bush brings warmth to medieval tower
God’s House Tower, a late 13th century gatehouse into the old town of Southampton, has had its heating systems modernized with the installation of a diverse selection of Dunham-Bush heat emitters, including fan convectors, hydro-course trench heating and radiant panels, to meet the varying installation requirements of this ancient monument.

Architect Jake Edgley used two Titon HRV10 Q Plus units with Trimbox NO2 filters on his own self-build home. And he has since gone on to recommend them to his clients.

Vital Energi at Royal Arsenal Riverside M&E package
Vital Energi are continuing their relationship with Berkeley Homes after being awarded the £7m mechanical and infrastructure package for the next phase of the scheme.

SES Engineering Services wins place on major regeneration project
SES Engineering Services has been appointed to deliver mechanical, electrical and plumbing services on Phase One of Milburngate, the prestigious mixed-use regeneration scheme on site in Durham city centre. This is a multi-million-pound contract win for its North East office working with main contractor, Tolent.

Remeha boilers at the cutting edge of science
The UK’s Science and Technology Facilities Council (STFC) has refurbished a series of heating systems at its Harwell Campus in Didcot using Remeha high-efficiency condensing boilers.

Grundfos in Riverside Thames project
With internal flexibility now a core demand of so many new building projects, the design and delivery of the new Riverside Studios in London has successfully managed to combine a range of entertainment options into a new exciting space. This new build project, on the banks of the River Thames, has been carefully designed to offer a free-flowing area that can be transformed to meet any demands for theatre, studio, cinema, music, dance, comedy, art, comedy, art, events or hospitality needs.

Coolair brings efficiency to Gloucester landmark project
Coolair Equipment has won a contract worth over £300,000 to install an air conditioning system with heat recovery at the Gloucester Business Park at Brockworth. Gloucester Business Park was officially opened in September 2000 and is home to more than 70 companies including Direct Wines, Horizon Nuclear Power, Ageas and TBS Engineering.

All smiles with Dunham-Bush in Glasgow
Dunham-Bush Panther fan coil units have been installed at the Glasgow Dental School. Fitted in the Restorative Clinic at level 6 of the building by contractors James Frew, these high specification units were selected for their quiet powerful operation, energy efficiency and easy access for on-going maintenance.

Megaflo helps Lush make a splash
When the Norwich branch of the fresh handmade cosmetics retailer moved to a larger unit in order to meet rising customer demand, a new hot water cylinder was needed to supply enough water for product demonstrations and use in staff facilities throughout the day – no matter the time of year.

Viessmann in tallest modular building
Viessmann boilers and a Viessmann CHP unit have been specified for 101 George Street in Croydon. The project is the tallest modular building in the world.

Bath and West Pavilion makes the Smart choice
High-performance Toshiba Smart Cassettes running on low Global Warming Potential (GWP) R-32 refrigerant are at the heart of a new air conditioning system at Bath and West Showground’s recently refurbished restaurant.

Trox discovered in Birmingham Uni labs
Trox Easylab air management systems, VAV units, and fume cupboard controllers have been chosen to optimise energy efficiency at the new BREEAM 'Excellent'-rated Collaborative Teaching Laboratory (CTL) at the University of Birmingham.

Slice of success for Elta Fans at Pizza Hut
A nationwide project to upgrade Pizza Hut’s kitchen ventilation systems to a higher performing, energy efficient solution is underway. Project manager Marcus Sawkins of GFMS Services has already upgraded several of the restaurants’ systems with the Elta Fans QUBE Centrifugal Box Fan which is reducing energy usage.

Heat pumps for Ribble Valley homes
Developer Chipping Homes has specified air source heat pumps from NIBE for its attractive Fellside development in the picturesque village of Chipping in the Ribble Valley, which comprises 39 family homes.

Carrier books successful project at Lambeth
Precious books and manuscripts dating back nearly 1,000 years will be protected in controlled environmental conditions courtesy of high efficiency Carrier AquaSnap chillers and heat pumps in a new world-class library at Lambeth Palace, home of the Archbishop of Canterbury.

Hospital targets energy savings
Grundfos Pumps were delighted to play their part in helping a hospital achieve energy savings by providing the Sligo University Hospital with a detailed Energy Check report. This outlined the energy savings that were achievable by exchanging the hospital’s existing pumps with intelligent MAGNA3 and TPE3 pumps.

Dunham-Bush evolves school solution
It was a case of natural selection when Dunham-Bush Evolution radiant panels were installed at the recently refurbished sports hall and gymnasium at the Charles Darwin School in Biggin Hill, Kent.

Trox fancoils for Crossrail office development
Trox fancoils and grilles have been selected for a new office development at Farringdon East Crossrail station in London. The development, known as Kaleidoscope, will be a six storey office building of 88,600 sq ft with a restaurant unit on the ground floor.

The Eagles Community Arena (ECA) is a new purpose-built community sports arena for grassroots sports of all ages and abilities.

Geyser Thermal Energy at eco resort
The luxury Tyram Lakes eco resort is working with renewable energy experts Geyser Thermal Energy to reduce energy use without sacrificing guest comfort.

Castle Building Services Organisation (CBS), an independent building services design and installation contractor, has announced a significant £6 million education sector contract win for its North West Office.

Viega at engineering training facility
Viega has supplied its German engineered press connection technology to the development of a new state-of-the-art engineering centre at Coleg Menai’s Llangefni campus.

Pump House supports Swansea Hospital services
Funding approved by the Welsh Assembly has seen the most up-to-date and powerful MRI scanner in Wales being installed at Singleton Hospital, Swansea.

Oil to water for Oxfordshire Golf Club
The Oxfordshire Golf Club, Hotel & Spa is set to reduce its energy bills by one third as it switches to a far more economical and sustainable supplier - its own natural resources.

As part of a major refurbishment, the 180-year-old Studley Castle in Warwickshire needed to refurbish its boiler plant to provide hotel guests with highly efficient and reliable heating and hot water generation.

Carrier harnesses river energy
Carrier has supplied three high efficiency AquaForce heat pumps with a combined capacity of 5.0 MW for an innovative project harnessing energy from a local river.

The first major structure to be built at Euston as part of HS2 has received the green light, with the London Borough of Camden approving the design for the high speed rail project’s eye-catching structure which will house technical equipment and a ventilation shaft for London Underground.

Rinnai delivers hot water at Scarborough care home
Rinnai continuous flow hot water heating units have replaced a vastly oversized and an almost-redundant traditional style of system at the Coombe Hay Care Home in Scarborough.

Efficient cooling in Liverpool Arena from Mitsubishi Electric
The M&S Bank Arena in Liverpool is now able to deliver energy efficient cooling to audiences of up to 11,000 thanks to the installation of 46 e-Series modular chillers from Mitsubishi Electric.

Trox air conditioning in prestige London development
For the redevelopment project at 21 Dartmouth Street, London, a premium occupant experience was essential to complement the enviable location. The installation of a Trox air conditioning solution, including Trox X-Cube air handling units (AHUs), and X-Aircontrol modules, with the X-Aircontrol Zonemaster, is enabling the building to achieve outstanding levels of efficiency alongside elite levels of comfort.

Elco boilers set for new term at Cromwell School
Five Thision L Eco 120kW boilers from Elco Heating Solutions have been installed at Cromwell Junior and Infants School, Birmingham, as part of the complete refurbishment of the plant room. The new boilers have been arranged back to back on a cascade frame with a pre-fabricated header system – maximising the output in a restricted area.

Lochinvar boilers heat historic Glasgow office
Banbury-based Lochinvar has supplied three high efficiency, condensing boilers to the newly refurbished Baltic Chambers in Glasgow. Originally built by the Victorian developer Duncan McNaughton, it is a familiar landmark close to Glasgow Central railway station. The six-storey building retains many of its original features including its striking façade with ornate stonework and mosaic floor tiled entrance foyer.

Royal Papworth Hospital enters new era with Grundfos
Papworth’s first association with the field of medicine began back in 1918, when it was designated as a specialist TB treatment centre. Over the years it gained a pioneering reputation as a centre of excellence for transplants. Their success was formally recognised when it was granted a Royal title in 2017.

Built environment professionals remain positive on future of Net Zero
A recent survey by global climate tech firm IES has revealed that nearly three-quarters of UK built environment professionals believe achieving a Net Zero built environment by 2050 is within reach.
BESA research suggests clients are yet to engage with new building safety regime
Construction clients are failing to engage with the new building safety regime, according to research carried out by the Building Engineering Services Association (BESA).